Every facilities leader has been handed the big scary number: a deferred maintenance backlog so large it stops meaning anything. Erica Barbuto, Managing Partner of Halcyon Facilities Group, was on the owner side of that number before she co-founded a firm to fix it. Her approach starts by asking which critical equipment is unstable, then scopes refurbishment projects with the operators and technicians who keep that equipment running. The result is a capital renewal plan that covers far more assets each year and gives the CFO a list of solutions instead of a liability.

Key Takeaways

→ Narrow the backlog to the source equipment whose failure hits students, research, or teaching: air handling units, boilers, chillers, and switchgear. That turns a $1 billion figure into a five-year plan closer to $200 million.

→ Ask whether an asset is unstable, not whether it is old. Plenty of old equipment can be refurbished and stabilized for another 10 years.

→ Refurbishment work can often go straight to subcontractors with no design firm or general contractor, and parts arrive sooner. A capital list grows from about 10 assets to 50 to 100.

→ Measure building health with percent stable across critical assets and the cost to stabilize the rest. Then protect the reinvestment with a preventive maintenance program the team has the people to run.

→ Funding follows execution. When a facilities director delivers year one and shows fewer reactive work orders and hot/cold calls, Erica has seen capital programs double the next year.

More conversations with higher ed leaders
Explore more Bow Tie Tuesday episodes and resources on facilities planning, space planning, and occupancy. Browse CampusIQ resources.

Read Full Transcript

Aaron Benz: Today we're talking about the bogeyman: deferred maintenance, capital renewal. I shouldn't say deferred maintenance, it's a bad word today. But in all seriousness, welcome to another Bow Tie Tuesday. I'm pleased to be joined by Erica, the founder of Halcyon, with a long tenure in education and in facilities dealing with all sorts of maintenance-related issues. Erica, can you help me dispel, or even just understand, what we do with these massive numbers for deferred maintenance or capital renewal? I see $500 million, $700 million, a billion. I'm like, those aren't even real numbers. Are those real? Help break that down for me.

Erica Barbuto: Yeah, thanks for having me, Aaron. I really appreciate it, and I'm excited to talk to you about fixing broken stuff. That is our main mission at Halcyon. It all started back when the three founders were all on the owner's side, and we were always told, "Here's your big scary number." We would go to our boards, we'd go to our leadership, communicate the need, and sometimes we'd get more money. But at the end of the day, we were left with: where do we go from here? We've gone from a billion-dollar deferred maintenance number with $20 million of capital. How do we pick the right projects? How do we spend our dollars the best way when there's such a gap?

So what we really set out to do is identify the right risk. Out of that big scary number, what is the source equipment? Your air handling, your boilers, your chillers, your switchgear. What is the equipment that, if it fails, is going to have an impact on our students, on our research, on our teaching? That's how we start to narrow that big scary number into something a little more realistic.

Then we take the next step: do I really have to replace everything? Does everything that is old have to be replaced? We flip the narrative. Instead of worrying about what's old, we worry about what's unstable, and then how we get it to stable. Do we have to replace it, or is this unit worth saving? Can we refurbish it? When we integrate that refurbishment model into our capital plan, projects are smaller in dollars, smaller in scope, and smaller in schedule. By doing all that, we can get a lot more assets stabilized in any given year with any given budget.

That's the model we introduced when we worked on the owner side. We needed to stabilize a lot more assets than the 10 air handlers and boilers we replaced the year before, because I'm sitting on a portfolio with a billion dollars of deferred maintenance, and I need to attack hundreds of assets every single year, not a handful. So the billion dollars is scary, but then we have a $200 million five-year plan. That's so much more tangible to bring to our board and our leadership, and so much more tangible for our boots-on-the-ground team to execute.

Aaron Benz: Fascinating. So how do you think about it? I'm used to seeing critical, or high, medium, and low. Is there a different way to understand that? Somebody gets a facility condition assessment, but then you help translate it into what is sick or unstable, and re-evaluate what those mean. Just because something is old doesn't mean it's actually unstable. I imagine a huge win for facilities leaders is: how do I sleep well at night knowing it's not going to implode on me?

Erica Barbuto: Yeah. One gap in the market we've really identified is this. When we were on the owner side, whenever we had major failures, and I can think of many times where a boiler plant goes offline Saturday night at 2 a.m. in the middle of winter, we were calling our operators, our contractors, our subject matter experts. We were calling the reliable people who come out at 2 in the morning and get that boiler plant back online. Those are not the people doing our condition assessments. That's how we end up with this list of old assets that need replacing.

But when we bring in the operators and the technicians early in the phase, instead of "Hey, fix our broken stuff," it's "Identify what's going to fail." Those are the right people. They know how these systems work. They can scope these projects, rather than relying on models that say, "This is old, this is what you need to replace it with." That's how we get to the right stabilization scope. Now, instead of a capital list that's this short, with 10 assets, we have one this long, with 50 to 100 assets.

Aaron Benz: So if I heard you correctly, it's not just about how some third-party auditor assesses things. There are people here working on these systems all the time. How do we make sure to include their input, especially on all the little things, which turn out to be lots of big things? That can go much, much further.

Erica Barbuto: Yeah, essentially. We always talk in theory about moving from reactive to proactive. Well, how do we put that in play? It's getting the right people to assess, getting them to scope and budget the right projects. Then you can go to your leadership and say, "Here's this big scary number, but this is what we actually have to stabilize, this is the cost to stabilize, and guess what? I can get it done this year."

When you reintroduce refurbishment projects, most of the time you don't need a design firm. You don't need a GC. You can go direct to subcontractors, and lead times for parts are shorter. All of a sudden, you're taking these massive replacement projects that take years and millions of dollars, and you now have a capital plan with hundreds of assets you can get done in short outages, direct with your subcontractors. That's the exciting part. For decades, across all industries, we've seen deferred maintenance charts just keep going up and up. This is the method that really changes what that chart is going to look like in the future.

Aaron Benz: Right. So foundationally, it's upgrade, don't buy. If you think you have to rip and replace and involve all these other firms, first figure out whether you can refurbish. It sounds like not only is it cheaper, but the time to value, where you actually get to see the results, is way faster. How are you able to assess what is actually worth refurbishing versus when you still have to go the long route and do a real replacement?

Erica Barbuto: Replacement doesn't go away. There's always a time and place for it. When programs change, MEP requirements change with them. If you need more capacity, you're going to need a new unit. Sometimes obsolescence becomes a different type of risk, where there's nothing to buy and you have to replace it. And you always have to evaluate it from a financial perspective: what is the refurbishment cost versus the replacement cost? Nine times out of 10, refurbishment projects are going to be cheaper, but you always need to do that side by side. If you're going to refurbish and stabilize for 10 years, you want to make sure the investment is the right amount for the 10 years you're buying.

Aaron Benz: If you were going to encourage a facilities leader to think about different metrics to understand whether their buildings are healthy and on the right track... Again, I find the big deferred maintenance number so unhelpful. To me it's like a fake number. I'm in stasis looking at it. Is it how much scheduled versus reactive maintenance you're doing? Is it how much new rip-and-replace versus refurbishing dollars or projects? How would you encourage a facilities leader to rethink whether they're on the right track to get their buildings stable?

Erica Barbuto: A metric we always use is percent stable. First, what are your critical assets? By critical, I mean if this goes down, we have building impact, student impact, learning and teaching impact. What is that equipment, and how much of it do you own? Of that equipment, how much is stable and how much is unstable? That's what I call the health of the building. Then, what is the cost to stabilize? That gives you two very strong metrics: here's my baseline, here's what's stable, here's what's unstable, and here's my plan and the cost to stabilize. Those are the capital metrics we use.

On the maintenance side, when we make the reinvestment, are we maintaining these assets so we get the full useful life? How do we protect that reinvestment and maintain business continuity across the campus? That's where you look at preventive maintenance programs. Do we have the right inventory in our CMMS? Do we have the right schedules, the right tasks? Do we have the right personnel to execute the PMs? That tells you whether you're maintaining the equipment so you get the best value, and the longest value, out of it.

Aaron Benz: That's super helpful. If you're a facilities director and here's the money you have to work with, that's at least what you can control, and there are some interesting ways to stretch it further. How have you seen facilities directors get more money, frankly? The ones you see doing it really well, how do they tell their story? What are they providing to the CFO or the cabinet to encourage them to fund fixing problems and getting to stability?

Erica Barbuto: I've seen it work a couple of ways for a few different clients. One: always present projects, not a problem. An FCA will turn over, "Here's your big scary number, here's your liability, here's your problem." Come to them with the projects. That's what Halcyon does. We go out and assess for operating condition and operating performance, and we scope projects, and that's what gets turned over. It's not the big scary number. It's the five-year project list. We've determined what's stable and unstable, and we've determined the cost to stabilize. So you can go straight to your CFO and say, "I have a list of solutions right here, and guess what? It's feasible. We can execute it. We can do it on time and on budget." That's step one.

Photos also go a very long way. They can be scary, but make it real. There's only so much a PM can do if your dampers are rusted shut. The PM is not going to do anything; you need to replace the damper. That can really start to spark "We need different dollars to support our maintenance teams," and it can push programs and capital plans to get approved.

What I've also seen work: when you have that long list of projects and you go through year one and execute all of it, you come back and say, "I have a new list. It's longer, it's more expensive, but look at how much I accomplished last year. You can trust me with these dollars, and campus is better for it. My reactive work orders are down. My hot/cold calls are down. My incident reports are down." I've seen clients whose capital program doubled from year one to year two. I've seen clients where there were no infrastructure capital plans, no maintenance reserve, no capital renewal, and it was, "I'm going to present a list of projects, a list of solutions," and the board said, "OK, here you go, here's a check." That's always a really nice story.

Aaron Benz: Oh, that's great. So maybe to recap some of the big points: don't just come with problems, come with solutions. When you come with solutions, especially for refurbishing, that's quick, which means you get bigger wins, which means the story you get to tell next year can be a really good one. Then you use that data to tell the story of how efficient you are at upgrading your buildings and getting them to stability. And pictures make it real. Educate on what this actually means. You might not know what a chiller is, or a rusted vent, but would you want this in your house?

Erica Barbuto: Yeah. We had a client a few years ago. It was Christmas Day, it was zero degrees, and I think it was something like 14 different coils that burst. Not a great day. Right after that, it was, "Go do stabilization for this whole building. Tell me what the needs are." It was a huge building with over 50 air handlers, and I think they funded 12 coil replacements the very next year. That facility director could sleep at night the next winter, because instead of one brand-new air handler, he had 12 brand-new coils that weren't going to burst on Christmas Day.

Aaron Benz: Oh, that's a great story. Maybe last question: what are you excited about for the future? What's next in your world, or how are you looking at doing things differently or better?

Erica Barbuto: I think this simple concept of fixing broken stuff is really catching on. It's simple, like, "Yes, this makes sense," and people have a really big appetite for it. Like I said earlier, I'm excited for those deferred maintenance charts to reverse and go down, because there is a real way to operationalize the condition assessment. There's a real way to make our buildings operate more smoothly, maintain business continuity, and support the research and the learning happening on campus. In all the conversations I've been having, there's an appetite for it, and people are really starting to grasp that this is feasible. We can achieve this. There's been so much emphasis on bringing awareness to deferred maintenance through the big scary number, and now it's, "All right, let's go do something about it." People are ready. Let's go make it happen.

Aaron Benz: That's awesome. Erica, thank you so much for being on Bow Tie Tuesday. It's been an absolute pleasure to have you on.